Poyntelle Roofing Services
Everything we do is roofing. That focus means our Poyntelle crews install more roofs per year than companies that try to do siding, windows, and remodeling on the side.
Roof Replacement
We replace roofs. It's what we do more than anything else. Our Poyntelle crews average 15-20 complete tear-off and replacements per month. That kind of volume means we've seen every situation: steep pitches, multiple layers, rotted decking, improper ventilation from the last guy. We fix all of it and install a roof system that's warranted for decades.
Get a Free Quote โRoof Repair
Missing shingles from wind damage expose the underlayment to UV degradation. If the underlayment is compromised, water intrusion follows the next rain. We don't just replace the missing shingle. We pull back surrounding courses, inspect the underlayment for UV damage and nail holes, replace compromised sections, and weave new CertainTeed Landmark or IKO Cambridge shingles into the existing field. Proper repair, not a patch.
Get a Free Quote โStorm Damage Repair
Wind speeds above 60 mph cause shingle tab lift and adhesive seal failure per ASTM D7158 testing protocols. Our Poyntelle inspectors check the entire windward exposure. Not just the obvious damage. Poor ventilation causes ice dams which cause water intrusion under the shingle field during freeze-thaw cycles. We document all contributing factors so your insurance claim covers root-cause repairs, not just surface patches.
Get a Free Quote โNew Roof Installation
We install new roofs on new homes, additions, detached garages, carports, and covered patios. Material options include asphalt architectural shingles, metal standing seam, metal corrugated, and flat membrane systems. We help you choose based on your budget, aesthetic preference, and the specific demands of your Poyntelle climate.
Get a Free Quote โMetal Roofing
We install 24-gauge and 26-gauge steel standing seam panels in Galvalume and pre-painted finishes. Concealed fastener clips allow the panels to expand and contract with temperature changes without stress on the fasteners. That's why standing seam doesn't leak. The clips float.
Get a Free Quote โShingle Roofing
CertainTeed Landmark PRO with NailTrak technology and Max Def color blends. Dimensional color depth that mimics natural cedar. Algae-resistant with StreakFighter technology. Class A fire rating, ASTM D3462 compliant, rated to 110 mph per ASTM D3161 Class F (Landmark PRO IR rated to 130 mph). 5-Star SureStart Plus warranty when installed by CertainTeed SELECT ShingleMaster. That's us. The warranty covers 100% of material and labor costs for 20 years with declining coverage for 30 more.
Get a Free Quote โFlat Roofing
The number one cause of flat roof failure is ponding water. Standing water that doesn't drain within 48 hours after rain. We solve ponding by installing tapered insulation systems that create positive slope to drains, scuppers, or roof edges. Minimum 1/4" per foot of slope eliminates standing water.
Get a Free Quote โCommercial Roofing
Commercial roof maintenance programs keep small problems from becoming big ones. We offer annual and semi-annual inspection contracts for Poyntelle building owners. We find and fix issues before they cause interior damage to your inventory, equipment, or tenant spaces.
Get a Free Quote โGutter Installation
We custom-form seamless aluminum gutters on-site from a continuous coil of .027 gauge stock. No factory seams means no seam failures. We form them to the exact length your fascia requires. One piece, one gutter, no leaks.
Get a Free Quote โRoof Inspection
Our inspection covers the roof and the attic. From the attic, we check for daylight through the roof deck, moisture stains on rafters, mold on sheathing, and ventilation function. Problems in the attic often indicate roof issues that aren't visible from the surface.
Get a Free Quote โEmergency Roof Repair
After we secure the tarp and stop the leak, we photograph and document everything while the damage is fresh. This documentation is critical for insurance claims. Adjusters want to see the damage before any repairs are made.
Get a Free Quote โSkylight Installation
VELUX FS (fixed) and VS (vented) skylights installed with EDL flashing kits for shingle roofs. The multi-step flashing integrates with the surrounding shingle courses per IRC R903.2. We frame the curb with doubled 2x8 or 2x10 lumber (depending on rafter depth), install ice and water shield membrane around the entire curb perimeter, then set the skylight with factory sealant before weaving step flashing into the field. Top headwall flashing tucks under the upslope shingle course. Bottom sill pan diverts water onto the downslope shingles. Zero exposed sealant joints. Mechanical flashing only.
Get a Free Quote โ